1.0 OBJECTIVE
To lay down the procedure for cleaning, operation &
Calibration of Disintegration Apparatus
2.0
SCOPE
This SOP shall be applicable for cleaning, operation &
Calibration of Disintegration Apparatus in
Chemistry Lab.
3.0
RESPONSIBILITY
3.1
Chemist and above shall be responsible for the
preparation and execution of this SOP
3.2
QC & QA Head shall be responsible for the checking and approval of this
SOP.
4.0
ACCOUNTABILITY
Head QC
5.0
PROCEDURE
5.1
Cleaning
5.1.1
Ensure that power supply to the Disintegration apparatus is
switched ‘OFF’ before cleaning and plug shall be remove from the socket.
5.1.2
All surface, walls, top, bottom of the Disintegration
apparatus shall be wipe with dry lint free cloth on daily basis so that there
will be no dust particles in the Disintegration apparatus
5.1.3
All the parts and outer surface of the Disintegration
apparatus shall be wipe with wet lint free cloth soaked in purified water, on
weekly basis.
5.2
Operation
5.2.1
Ensure the cleanliness of the instrument.
5.2.2
Ensure that” the power supply to apparatus is switch “ON.
5.2.3
Ensure for the electronic temperature controller displays the
chamber temperature.
5.2.4
Required temperature shall be set by pushing the “PUSH” switch and the coarse
potentiometer knob shall be rotate clockwise or anticlockwise until the
required temperature attain.
5.2.5
Temperature shall be set with
the help of fine potentiometer knob.
5.2.6
Ensure for the Indicator Bulb glows indicates that the power
to the heater is “ON”.
5.2.7
Ensure that before attempting the testing, the apparatus
shall be switched on for at least 20 minutes before.
5.2.8
Ensure that the number of strokes per minute of the
basket shall be recorded.
5.2.9
Ensure that the temperature of water shall be checked
for the disintegration by a calibrated thermometer.
It shall be 37± 2.00C.
5.2.10
Ensure If the number of the strokes and temperature of
water are within the tolerance limit; the instrument shall be calibrated and
performing correctly.
5.2.11
Enter the cycle period in daily usage log book.
5.2.12
Calibration Procedure
Calibration of Disintegration
Apparatus shall be done by external party on annual frequency.
6.0
REFERENCES
Not Applicable
7.0
ANNEXURE
Not Applicable
8.0
ABBREVIATIONS
SOP : Standards Operating Procedure
QC :
Quality Control
HOD : Head of the Department
QA : Quality Assurance
QCD : Quality Control Department
QAD : Quality Assurance Department
EQP : Equipment