SOP FOR OPERATION OF VORTEX SHAKER



1. Objective: To lay down the procedure for the operation of the Vortex shaker.

2. Responsibility: It is the responsibility of the Technical Assistant, Technical Manager, Quality Manager, and all individuals working on the instrument.

3. Instrument Details:

Make-: ..................................., Model-: .................................................



4. Procedure:

· Enter in the log book (in and out time).

· Switch on the machine.

· Put the vessel on the pan area and allow shaking for desired time.

· Again check whether the operation is done or not.

· In case of operation incompleteness again repeats the same.

· Switch off the machine.



5. Precaution:

· Clean the machine area every day

· The sample putting pan area should be handled with care.





SHARE

Owner

Hi. I’m Writer of Researchsop.com. ’ ’ Please share these SOPs to all concern pharma people for their development. I like to fullfill the need of curious people. These things inspire me to make things looks better.

  • Image
  • Image
  • Image
  • Image
  • Image
    Blogger Comment
    Facebook Comment

0 comments:

Post a Comment