1. Objective: To lay down the procedure for the operation of the Vortex shaker.
2. Responsibility: It is the responsibility of the Technical Assistant, Technical Manager, Quality Manager, and all individuals working on the instrument.
3. Instrument Details:
Make-: ..................................., Model-: .................................................
4. Procedure:
· Enter in the log book (in and out time).
· Switch on the machine.
· Put the vessel on the pan area and allow shaking for desired time.
· Again check whether the operation is done or not.
· In case of operation incompleteness again repeats the same.
· Switch off the machine.
5. Precaution:
· Clean the machine area every day
· The sample putting pan area should be handled with care.