1.0 OBJECTIVE
To lay down the procedure for operation of Friability test
apparatus
2.0
SCOPE
This SOP shall be applicable to the Friability test apparatus
used in QC Dept.
3.0
RESPONSIBILITY
3.1
Chemist QC and above
shall be responsible for the preparation and execution of this SOP
3.2
Sr. Chemist QC & above
and QA Head shall be responsible for the checking and approval of this
SOP.
4.0
ACCOUNTABILITY
Head QC
5.0
PROCEDURE
5.1
Cleaning
5.1.1
Ensure that power supply to the Friability Test
apparatus is switched
‘OFF’ before cleaning and plug shall be removed from the socket.
5.1.2
Friability Test apparatus shall be kept on a clean table/platform.
5.1.3
Platform of Friability Test apparatus shall be wiped with a dry lint the free cloth on a daily basis so that there will be no dust particles on the Friability
Test apparatus
5.2
Operation
5.2.1
Ensure that the power supply to the Friability test
apparatus is switch “ON.”
5.2.2
The
locking nut shall be unscrewing to release the drum.
5.2.3
Ensure
that the accurate weighing of the tablets.
5.2.4
Weighed
tablets shall transfer the in the drum and ensure for the tightly closing of
the drum.
5.2.5
Ensure
that the apparatus is switch on and the resolutions shall be counted as specified
in the monogram.
5.2.6
Ensure
that the tablets shall be tumbled at each turn of the drum by a curved projection that extends from the middle of the drum to the outer wall.
5.2.7
Ensure
that the drum shall rotate 100 times and after that, the tablets shall be
remove from the apparatus.
5.2.8
Ensure
that any loose dust or broken tablets and shall be removed
5.2.9
Weighing
of tablet shall be done after rotation.
5.2.10
Ensure
that the instrument shall be switched off when not required.
5.2.11
The
percentage of weight loss shall be calculated using the following formula.
% weight loss = Initial weight – Final weight
Initial weight ×100%
5.2.12 Calibration
Procedure
Calibration of Friability
test apparatus shall
be done by the external party on an annual frequency.
6.0
REFERENCES
Not Applicable
7.0
ANNEXURE
Not Applicable
8.0
ABBREVIATIONS
SOP : Standards Operating Procedure
QC : Quality Control
HOD : Head of the Department
QA :
Quality Assurance
QCD : Quality Control Department
QAD : Quality Assurance Department
EQP : Equipment
0 comments:
Post a Comment