SOP FOR MUFFLE FURNACE DIGITAL | STANDARD OPERATING PROCEDURE CLEANING, OPERATION & CALIBRATION OF MUFFLE FURNACE DIGITAL

 1.0           OBJECTIVE

To lay down the procedure for operation of Muffle furnace digital.

2.0             SCOPE

This SOP shall be applicable to Muffle furnace digital used in QC Dept.

3.0             RESPONSIBILITY

3.1             Chemist QC and above shall be responsible for the preparation and execution of this SOP.

3.2            Sr. Chemist QC & above and QA Head shall be responsible for the checking and approval of this SOP.

4.0            ACCOUNTABILITY

Head QC

5.0            PROCEDURE

5.1            Cleaning

5.1.1     Ensure that the power supply to the Muffle Furnace Digital is switched ‘OFF’ before cleaning and plug shall be removed from the socket.

5.1.2        Muffle Furnace Digital shall be kept on a clean table/platform.

5.1.3        Platform of Muffle Furnace Digital shall be wiped with a dry lint the free cloth on a daily basis so that there will be no dust particles on the Muffle Furnace Digital.

5.2              Operation

5.2.1        Ensure that temperature setting knobs-“TEMP.SET” and “FINE CONTROL” shall be at a normal position.

 

5.2.2        Ensure that the instrument shall be connected to the mains and switch “ON”.

 

5.2.3        Ensure that the Toggle switch is “ON” (on the front panel).

 

5.2.4        Ensure that the line indicator –“M” (red) glows (on front panel).

 

5.2.5        Ensure that the “PRESS TO SET “button shall be the push and simultaneously set the specified

temperature by turning “TEMP SET” and “FINE CONTROL” knobs (on digital temperature indicator panel of the instrument).

 

5.2.6        Ensure that the front door shall be open and keep the sample inside the chamber (in silica/platinum crucible, as specified) using long tongs.

 

5.2.7        Ensure that the door shall be closed.

 

5.2.8        Ensure that the regulator indicator –“HEATER” (yellow) on the the front panel of the instrument  stops glowing when the set temperature shall be attained.

 

5.2.9        Ensure that the “MAINS” shall be Toggle “OFF” after completing the experiment.

 

5.2.10    Ensure that the mains shall be witch “OFF”.

5.2.11    Ensure that the door shall be open and the sample shall be taken out.

5.2.12    Ensure that the door shall be closed.

5.2.13    Calibration Procedure

Calibration of Muffle Furnace Digital shall be done by the external party on an annual frequency

6.0              REFERENCES

Not Applicable

7.0              ANNEXURE

Not Applicable

8.0              ABBREVIATIONS

SOP         :           Standards Operating Procedure

QC           :           Quality Control

HOD        :           Head of the Department

QA           :           Quality Assurance

QCD        :           Quality Control Department

QAD        :           Quality Assurance Department

            EQP         :            Equipment
SHARE

Owner

Hi. I’m Writer of Researchsop.com. ’ ’ Please share these SOPs to all concern pharma people for their development. I like to fullfill the need of curious people. These things inspire me to make things looks better.

  • Image
  • Image
  • Image
  • Image
  • Image
    Blogger Comment
    Facebook Comment

0 comments:

Post a Comment