2. Scope: This procedure is applicable to all complaints related to product testing.
3. Responsibility: Technical Manager is responsible to implement this.
4. Procedure:
4.1 All customer complaints are received either verbally or through mail/fax/hard copy. This complaint is logged in the customer complaint record.
4.2 The complaint is analyzed to determine the root cause, and after that suitable correction and corrective action is taken relevant to the root cause.
4.3 The corrective action taken is submitted to the customer.
4.4 Effectiveness of the corrective action is verified after one month.
5. References: Records are maintained for the same.
CHANGE HISTORY
Sr.No. | Date of change | Revision no. of old document | Date of old document | Revision no. of Revised document | Date of Revised document | Nature of change (addition/deletion) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
END OF THE DOCUMENT
***********************************************************************************
You Also Like to See This:
2. PTL /QSP/02 Procedure for Document & Data Control
3. PTL /QSP/03 Procedure for Purchasing, Services, and Supplies
4. PTL /QSP/04 Procedure for Service to the Customer
5. PTL /QSP/05 Procedure for Customer Complaints
6. PTL QSP/06 Procedure for Control of Non-Conforming Testing.
7. PTL /QSP/07 Procedure for Improvement
8. PTL /QSP/08 Procedure for Corrective Action
9. PTL /QSP/09 Procedure for Preventive Action
10. PTL /QSP/10 Procedure for Control of Records
11. PTL /QSP/11 Procedure for Internal Audit
12. PTL /QSP/12 Procedure for Management Review
13. PTL /QSP/13 Procedure for Training
14. PTL /QSP/14 Procedure for Housekeeping
15. PTL /QSP/15 Procedure for Estimation of Uncertainty of measurement
16. PTL /QSP/16 Procedure for Equipment
17. PTL /QSP/17 Procedure for Measurement Traceability and Calibration
18. PTL /QSP/18 Procedure for Sampling
19. PTL /QSP/19 Procedure for Handling of Test and Calibration Items
20. PTL /QSP/20 Procedure for Assuring the Quality of Test
21. PTL /QSP/21 Procedure for Reporting of Results
22. PTL/QSP/22 Procedure for use of NABL Symbol
3. PTL /QSP/03 Procedure for Purchasing, Services, and Supplies
4. PTL /QSP/04 Procedure for Service to the Customer
5. PTL /QSP/05 Procedure for Customer Complaints
6. PTL QSP/06 Procedure for Control of Non-Conforming Testing.
7. PTL /QSP/07 Procedure for Improvement
8. PTL /QSP/08 Procedure for Corrective Action
9. PTL /QSP/09 Procedure for Preventive Action
10. PTL /QSP/10 Procedure for Control of Records
11. PTL /QSP/11 Procedure for Internal Audit
12. PTL /QSP/12 Procedure for Management Review
13. PTL /QSP/13 Procedure for Training
14. PTL /QSP/14 Procedure for Housekeeping
15. PTL /QSP/15 Procedure for Estimation of Uncertainty of measurement
16. PTL /QSP/16 Procedure for Equipment
17. PTL /QSP/17 Procedure for Measurement Traceability and Calibration
18. PTL /QSP/18 Procedure for Sampling
19. PTL /QSP/19 Procedure for Handling of Test and Calibration Items
20. PTL /QSP/20 Procedure for Assuring the Quality of Test
21. PTL /QSP/21 Procedure for Reporting of Results
22. PTL/QSP/22 Procedure for use of NABL Symbol
-----------------------------------------------------------------------------------------------------------
Note: Replace DTL with PTL for Drug Testing Laboratory.
0 comments:
Post a Comment