1. Purpose: To define a system in the organization to conduct the training activities to meet the requirement of ISO/IEC 17025:2017.2. Scope: This procedure is applicable to all activities affecting the laboratory management system.
3. Responsibility: Technical Manager is responsible to implement this procedure.
4. Procedure:
4.1 First of all competency level of the laboratory personnel is determined, on the basis of this competency level the competency level of existing personnel is reviewed and training is imparted to make the personnel competent.
4.2 All new personnel will undergo the training of testing being performed in the PTL. Technical /Technical Manager will determine his suitability for performing the test after the successful completion of his training.
4.3 Training calendar is prepared for throughout the year, and training is provided accordingly. A record of the training provided and evaluation done is being maintained.
5. References:
a) List of personnel: ------------------
b) Training Calendar: -----------------
c) Competency level: -----------------
d) Determination of training need: -----------------
e) Record of Training: ------------------------
CHANGE HISTORY
Sr.No. | Date of change | Revision no. of old document | Date of old document | Revision no. of Revised document | Date of Revised document | Nature of change (addition/deletion) |
END OF THE DOCUMENT
***********************************************************************************
You Also Like to See This:
2. PTL /QSP/02 Procedure for Document & Data Control
3. PTL /QSP/03 Procedure for Purchasing, Services, and Supplies
4. PTL /QSP/04 Procedure for Service to the Customer
5. PTL /QSP/05 Procedure for Customer Complaints
6. PTL QSP/06 Procedure for Control of Non-Conforming Testing.
7. PTL /QSP/07 Procedure for Improvement
8. PTL /QSP/08 Procedure for Corrective Action
9. PTL /QSP/09 Procedure for Preventive Action
10. PTL /QSP/10 Procedure for Control of Records
11. PTL /QSP/11 Procedure for Internal Audit
12. PTL /QSP/12 Procedure for Management Review
13. PTL /QSP/13 Procedure for Training
14. PTL /QSP/14 Procedure for Housekeeping
15. PTL /QSP/15 Procedure for Estimation of Uncertainty of measurement
16. PTL /QSP/16 Procedure for Equipment
17. PTL /QSP/17 Procedure for Measurement Traceability and Calibration
18. PTL /QSP/18 Procedure for Sampling
19. PTL /QSP/19 Procedure for Handling of Test and Calibration Items
20. PTL /QSP/20 Procedure for Assuring the Quality of Test
21. PTL /QSP/21 Procedure for Reporting of Results
22. PTL/QSP/22 Procedure for use of NABL Symbol
3. PTL /QSP/03 Procedure for Purchasing, Services, and Supplies
4. PTL /QSP/04 Procedure for Service to the Customer
5. PTL /QSP/05 Procedure for Customer Complaints
6. PTL QSP/06 Procedure for Control of Non-Conforming Testing.
7. PTL /QSP/07 Procedure for Improvement
8. PTL /QSP/08 Procedure for Corrective Action
9. PTL /QSP/09 Procedure for Preventive Action
10. PTL /QSP/10 Procedure for Control of Records
11. PTL /QSP/11 Procedure for Internal Audit
12. PTL /QSP/12 Procedure for Management Review
13. PTL /QSP/13 Procedure for Training
14. PTL /QSP/14 Procedure for Housekeeping
15. PTL /QSP/15 Procedure for Estimation of Uncertainty of measurement
16. PTL /QSP/16 Procedure for Equipment
17. PTL /QSP/17 Procedure for Measurement Traceability and Calibration
18. PTL /QSP/18 Procedure for Sampling
19. PTL /QSP/19 Procedure for Handling of Test and Calibration Items
20. PTL /QSP/20 Procedure for Assuring the Quality of Test
21. PTL /QSP/21 Procedure for Reporting of Results
22. PTL/QSP/22 Procedure for use of NABL Symbol
-----------------------------------------------------------------------------------------------------------
Note: Replace DTL with PTL for Drug Testing Laboratory.