POLICY STATEMENT
The policy of the PTL is to abide to select and purchase its materials and services affecting the Test Quality by the Test Supplier.
1. Purpose: To define a system in the organization to purchase the materials and services affecting the quality of test results.
2. Scope: This procedure is applicable to all tests being conducted in the laboratory.
3. Responsibility: Technical Manager is responsible to implement this procedure.
4. Procedure :
4.1 Selection of supplier: Suppliers of reagents and other chemical consumables are selected on the basis of their brand name, market reputation, and on the basis of their past history/supplies.
4.2 The approved supplier list is prepared to include the material and service name and address of the contact person along-with selection criteria.
4.3 Purchase specifications are specified in the purchase order and approved by the Technical Manager.
4.4 All incoming materials affecting the quality of test results are inspected prior to use to ensure that the purchased products are meeting the purchase requirement.
4.5 Suppliers are evaluated on the basis of their supplied product quality and delivery.
4.6 In our scope laboratory material is there which requires some special storage conditions, however all the laboratory equipment, reagents, etc. are kept in controlled temperature and humidity.
5. References: Approved supplier list (PTL/---/F.1)
Test certificate of the items
CHANGE HISTORY
Sr.No. | Date of change | Revision no. of old document | Date of old document | Revision no. of Revised document | Date of Revised document | Nature of change (addition/deletion) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
END OF THE DOCUMENT
***********************************************************************************
You Also Like to See This:
2. PTL /QSP/02 Procedure for Document & Data Control
3. PTL /QSP/03 Procedure for Purchasing, Services, and Supplies
4. PTL /QSP/04 Procedure for Service to the Customer
5. PTL /QSP/05 Procedure for Customer Complaints
6. PTL QSP/06 Procedure for Control of Non-Conforming Testing.
7. PTL /QSP/07 Procedure for Improvement
8. PTL /QSP/08 Procedure for Corrective Action
9. PTL /QSP/09 Procedure for Preventive Action
10. PTL /QSP/10 Procedure for Control of Records
11. PTL /QSP/11 Procedure for Internal Audit
12. PTL /QSP/12 Procedure for Management Review
13. PTL /QSP/13 Procedure for Training
14. PTL /QSP/14 Procedure for Housekeeping
15. PTL /QSP/15 Procedure for Estimation of Uncertainty of measurement
16. PTL /QSP/16 Procedure for Equipment
17. PTL /QSP/17 Procedure for Measurement Traceability and Calibration
18. PTL /QSP/18 Procedure for Sampling
19. PTL /QSP/19 Procedure for Handling of Test and Calibration Items
20. PTL /QSP/20 Procedure for Assuring the Quality of Test
21. PTL /QSP/21 Procedure for Reporting of Results
22. PTL/QSP/22 Procedure for use of NABL Symbol
3. PTL /QSP/03 Procedure for Purchasing, Services, and Supplies
4. PTL /QSP/04 Procedure for Service to the Customer
5. PTL /QSP/05 Procedure for Customer Complaints
6. PTL QSP/06 Procedure for Control of Non-Conforming Testing.
7. PTL /QSP/07 Procedure for Improvement
8. PTL /QSP/08 Procedure for Corrective Action
9. PTL /QSP/09 Procedure for Preventive Action
10. PTL /QSP/10 Procedure for Control of Records
11. PTL /QSP/11 Procedure for Internal Audit
12. PTL /QSP/12 Procedure for Management Review
13. PTL /QSP/13 Procedure for Training
14. PTL /QSP/14 Procedure for Housekeeping
15. PTL /QSP/15 Procedure for Estimation of Uncertainty of measurement
16. PTL /QSP/16 Procedure for Equipment
17. PTL /QSP/17 Procedure for Measurement Traceability and Calibration
18. PTL /QSP/18 Procedure for Sampling
19. PTL /QSP/19 Procedure for Handling of Test and Calibration Items
20. PTL /QSP/20 Procedure for Assuring the Quality of Test
21. PTL /QSP/21 Procedure for Reporting of Results
22. PTL/QSP/22 Procedure for use of NABL Symbol
-----------------------------------------------------------------------------------------------------------
Note: Replace DTL with PTL for Drug Testing Laboratory.
0 comments:
Post a Comment